As Oy Keralinna – Electrical Renovation
Comprehensive Modernisation of the Electrical Systems in a Prestigious Residential Building
- Year completed: 2017
- Location: Kerava
- Size: 36 Apartments
- Property type: Apartment Building
- Main contractor: Terawatt Oy
Electrical Refurbishment of As Oy Keralinna
The electrical system at As Oy Keralinna was completely renewed.
As Oy Keralinna is the oldest purpose-built residential apartment building in Kerava. Built in the 1950s, this substantial stone-built property enjoys a prime location close to Kerava town centre.
Over the years, the housing company had undertaken extensive upgrades to various building services systems, but the electrical infrastructure was now due for modernisation. The existing electrical system was nearly 70 years old and no longer met modern requirements. Its age also presented a potential fire safety risk. Another recurring issue was blown fuses when several electrical appliances connected to the same circuit were used simultaneously.
The refurbishment included the renewal of electrical installations, telecommunications and TV aerial outlets, and distribution boards in the apartments. Dedicated supply cables were installed from the apartment distribution boards to the cookers, resolving the recurring fuse overload issues. New rising mains were also installed to supply the apartment distribution boards, with the cables discreetly enclosed in the stairwells.

Communal Areas
The electrical systems in the building’s communal areas were also completely renewed. A new incoming supply cable was installed from a nearby transformer substation, and lighting throughout the communal areas was significantly improved. Motion-activated lighting was installed in the stairwells, while socket outlets from Schneider Electric’s Renova range were selected for the communal spaces to complement the building’s original character.
Residents were given the opportunity to request additional and customised electrical works, such as choosing their preferred styles of switches and socket outlets or having additional sockets installed. Disruption to residents was kept to a reasonable level, with electrical works in each apartment taking approximately one week.
As part of the electrical refurbishment, the stairwells were also repainted under a subcontract managed by Terawatt, which was responsible for coordinating the painting works with the overall project schedule.
Terawatt’s team received excellent feedback from the client and residents, who became familiar with the electricians throughout the project. The works were completed in close and highly successful collaboration with the housing company, property manager and appointed supervisor.

Does your housing company's electrical system need upgrading? Request a quotation from us.
We have carried out electrical refurbishments in thousands of apartments.